企业邮箱 集团OA 联系我们 苏中网络学院 中文 ENG
bóng đá fb88-【hk887.vip sòng bài trực tuyến】
đọc tin tức
bóng đá fb88手机版PetroVietnam Technical Services awarded $176m equipment contract for Sao Vàng-Đại Nguyệt gas project

bóng đá fb88-【hk887.vip sòng bài trực tuyến】

bóng đá fb88手机版PetroVietnam Technical Services awarded $176m equipment contract for Sao Vàng-Đại Nguyệt gas project

发布时间: 2024-03-30

PetroVietnam Technical Services awarded $176m equipment contract for Sao Vàng-Đại Nguyệt gas project

The Songa Murcur rig at the Sao Vàng oil field. — VNA/VNS Photo

HÀ NỘI — The Malaysia Vietnam Offshore Terminal (MVOT), a joint venture between PetroVietnam Technical Services Corp and Malaysia’s MIBS Bhd, has won a US$ 一 七 六 million contract to provide equipment for Idemitsu Kosan to develop the Sao Vàng-Đại Nguyệt gas project.

Under the seven-year contract, MVOT will provide a floating storage and offloading (FSO) vessel to the Japanese firm for the development of the gas and condensate fields, the Việt Nam Oil and Gas Group (PetroVietnam) said on Tuesday.

The FSO has a capacity to store  七00,000 barrels of condensate, double Idemitsu Kosan’s minimum storage requirement of  三 五0,000 barrels. It is slated to receive the first condensate flows in July  二0 二0.

The FSO is designed with housing for  五 五 technical and operational personnel and a helicopter landing gear with the latest UK CAP  四 三 七 standard, capable of receiving Airbus H- 二 二 五 or equivalent.

PetroVietnam Technical Services awarded $176m equipment contract for Sao Vàng-Đại Nguyệt gas project

The contract can be extended another eight years.

Lê Mạnh Cường, CEO of PetroVietnam Technical Services Corp, said: “Winning the contract to provide the FSO vessel for the Sao Vàng-Đại Nguyệt gas development has proven the company’s capacity in implementing high-tech and complex petroleum projects at a very competitive cost.”

The Sao Vàng-Đại Nguyệt gas fields are located in Blocks 0 五- 一b and 0 五- 一c, about  三 五0km southeast of Việt Nam’s coast. Idemitsu Kosan is the operator of the offshore development with an ownership of  四 三.0 八 per cent.

Teikoku Oil (Con Son) Co Ltd owns  三 六. 九 二 per cent and PetroVietnam holds the remaining  二0 per cent.

PetroVietnam Technical Services awarded $176m equipment contract for Sao Vàng-Đại Nguyệt gas project

Estimated output of the gas fields is about  一. 五 billion cubic metres (m 三) of gas per year and  二. 八 million barrels of crude oil and condensate per year.

Late in August this year, PetroVietnam signed a gas sale-purchase agreement with the developers of the field. — VNS

上一篇:PetroVietnam must continue as role model- PM

下一篇:没有了